CEPD · Module 1 — Production systems and SAM sprints
Allen’s Successive Approximation Model is a production rhythm. ADDIE remains a useful checklist. Prototypes exist to make decisions.
About 16 min
Practice in the lesson player
Sorting, matching, quizzes, and the module gate stay behind a free account so scored answers are not public. The teaching notes below are the same cited curriculum.
01
ADDIE as vocabulary: Analyze, design, develop, implement, evaluate — useful questions. · Fails when treated as a waterfall that forbids a prototype until month four.
SAM as rhythm (Allen, 2012): Savvy start: align on the performance problem before screens. · Iterative design and development: reviewable prototypes, short cycles.